How to check this Installation Procedure
When Using the parts included in the package
A symbol is described on the illustration in the case of using the parts included in the package
of this product.
Symbols in the Illustration
The frequently-performed operations are described with symbols in this procedure.
Screw
Connector
Tighten
Remove
Connect
Claw
Insert
Remove
Push
Checking instruction
Check
Visual Check
Sound Check
9
Installation > Option Installation Sequence
F-9-1
Harness
Disconnect
Secure
Free
Plug in
Turn on
F-9-2
9
Installation > Option Installation Sequence
Installation
This machine is installed by the user.
For details of installation procedure, refer to the User's Manual.
Option Installation Sequence
When installing options of this machine, be sure to note the following points.
1) When installing the Drum Heater-D1, be sure to install it first.
2) When installing the Copy Card Reader-F1 or USB Application 3-Port Interface Kit-B1 and
Super G3 Fax Board-AJ1 at the same time, be sure to install the Copy Card Reader-F1 or
USB Application 3-Port Interface Kit-B1 first.
3) Be sure to install the Super G3 Fax Board-AJ1 last.
9-2
9-2