Grounding switch (F259)

The option provides a switch with magnetic or electric locking for temporary
grounding. The main switch of the cabinet (air circuit breaker or load switch) and the
grounding switch are interlocked so that both cannot be closed at the same time.
The ground switch handle is located on the cabinet door.
Other options required: +F253 or F255
Not available for
• ACS800-07/U7/17/37 frames R5 to R8, R7i and R8i
• ACS800-07 frames n×R8i with options +C129 or +C134
• ACS800-17/37 frames n×R8i with option +C129.

Availability table

The following tables shows which line options are standard, optional or not available
for different drive types.
Option
code
-
-
F250
F251
F260
F253
F255
F259
1) The customer must take care of the protection according to the instructions given in ACS800-07
Hardware Manual (3AFE64731165 [English])
2) With load switch option, the internal main switch is removed from the supply module
3) Frames n×R8i are equipped with an air circuit breaker as standard. Frames R6, R7i and R8i are
equipped with a switch fuse.
+F253 or
+F255
Description
ACS800-07
Frames R5 to R8
Switch fuse
Standard
Internal main switch
N/A
Line contactor
Option
gG line fuses
Option

aR line fuses

Standard
Load switch
N/A
Air circuit breaker
N/A

Grounding switch

N/A
Drive
Supply
module
+F260
+F259
ACS800-07
Frames n×R8i
-
Standard when there
is no load switch
option
Option
N/A
Option
Option
Option
Option
ACS800-17
ACS800-37
3)
Standard
N/A
3)
Standard
N/A
1)
Standard
2)
N/A
3)
Standard
Option for frames
n×R8i
Line options (F)