SUN2000-(50KTL-ZHM3, 50KTL-M3)
User Manual
B Device Commissioning
B
Device Commissioning
Step 1 Access Device commissioning screen.
Figure B-1 Method 1: before login (not connected to the Internet)
Issue 03 (2022-08-30)
Copyright © Huawei Technologies Co., Ltd.
90