[ X Troubleshooting ]
(10) Screw down the reactor cover with three screws.
(11) Screw down the control box with three screws to the unit.
(12) Reinstall the wires inside the control box, control box panel,
and the service panel FU back in place to complete the
procedure.
HWE22020
Screws (3 places)
Screws (3 places)
Screws for on-site wires
(4 places)
- 171 -
Reactor cover
Screws (2 places)
Connector
Ground wire screw
GB