2.2
Power ON and OFF Sequence
After the connection of the emulation probe to the target system has been completed, switch on the power.
The sequence for switching the power on/off is shown below.
Caution Be sure to follow the correct sequence for switching the power ON and OFF. Otherwise,
the IE-75001-R could be damaged.
(1) If the IE-75001-R is connected to the target system
•
Power ON sequence
<1> Switch on the power of the IE-75001-R.
<2> Switch on the power of the target system.
•
Power OFF sequence
<1> Switch off the power of the target system.
<2> Switch off the power of the IE-75001-R.
CHAPTER 2 CONNECTIONS
11