Engine Installation - Polaris RZR 900 2017 Service Manual

Hide thumbs Also See for RZR 900 2017:
Table of Contents

Advertisement

ENGINE INSTALLATION

1. Carefully install the engine in the frame.
2. Install the four bolts retaining the engine to the front
engine mount. Torque bolts to specification.
TORQUE
Engine Mounting Bolts (front):
40 ft-lbs (54 Nm)
9930588 R02 - 2017-2020 RZR 900 900/S 900/S4 1000/S 1000/S4 Service Manual
© Copyright Polaris Industries Inc.
ENGINE / COOLING SYSTEM
3. Install the Clutch Center Distance tool (PU-50658-A)
onto the crankshaft and transmission input shaft to
properly position the clutch center distance.
PU-50658–A
YEAR
HOLE
VEHICLE DESCRIPTION
1
2012
2011-14
2
2014-15
2013
2014-16
2015-19
2015-16
3
2013–19
2014–19
2015-19
2014-19
2015-19
4
2016-19
2016–19
2016–19
5
2015-18
i.e. 2015 RZR 900 uses the holes marked with a 4
RZR 570
RZR 900
RZR XP 1000
RANGER 900
ACE
ACE 570
RGR ETX
RZR 570
RANGER 500/570
RANGER 570 Full-Size
RANGER 900/1000
RZR 900
RZR 1000
ACE 900
GENERAL
RANGER Diesel
3.27
3

Advertisement

Table of Contents
loading

Table of Contents