Engine Installation - Polaris RZR XP 1000 2014 Service Manual

Table of Contents

Advertisement

ENGINE / COOLING SYSTEM

ENGINE INSTALLATION

Use the following procedure to reinstall the engine
assembly.
1. Attach engine with suitable lifting straps to an
overhead or portable engine hoist.
2. Remove the engine stand adapter plate and install
the starter motor back onto engine. Torque starter
motor bolts to specification.
3. Install transmission joint bracket onto engine and
torque fasteners to specification in sequence.
TORQUE
Starter Motor Bolts:
7 ft-lb (10 Nm)
Trans Joint Bracket Bolts:
44 ft-lb (60 Nm)
3.30
4. Use the overhead or portable engine hoist and
suitable engine straps to lower the engine into the
vehicle frame.
Have an assistant help guide the engine in and out of
the vehicle while using an engine hoist to prevent
personal injury or damage to vehicle components.
5. Align both the front and rear engine mounting
locations. Install and hand tighten the four front
engine mounting nuts
DO NOT torque fasteners at this time.
6. Align transmission joint mounting holes with the
transmission front mounting holes.
9926816 R07 - 2014-2016 RZR XP 1000 / XP4 1000 Service Manual
NOTE
q
w
and bolts
.
NOTE
© Copyright Polaris Industries Inc.

Advertisement

Table of Contents
loading

Table of Contents