2.
Rack Installation Specifications
Installable Racks
Figure 31 Unit Installation Area
Front door of the rack
Table 23 Specifications for the Unit Installation Area
Specification
(1)
Rack front space
(Space between the fixed part of the ETERNUS DX
on the front side and the front of the rack)
(2)
Mount bracket length
(Size between each end of the front and rear rack
pillars)
(3)
Rack space
(Space between the fixed part of the ETERNUS DX
on the front side and the rear of the rack)
(4)
Rack mount kit installation area
■
Placement Requirements
When determining service areas, refer to the manual of the rack that is to be used.
Make sure to perform the installation according to the placement requirements described in
cations" (page 7)
FUJITSU Storage ETERNUS DX100 S4/DX200 S4, ETERNUS DX100 S3/DX200 S3 Hybrid Storage Systems Site Planning Guide
(1)
(2)
ETERNUS DX
(4)
Rack pillars
and
"Installation Environment" (page
Copyright 2021 FUJITSU LIMITED
(3)
Rack rails
Rear door of the rack
Conditions when high-density drive
Condition
enclosures are installed
40mm or more
80mm or more
685mm or more
685mm or more
775mm or less
750mm or less
830mm or more
915mm or more
482mm or more
490mm or more
(recommended)
28).
55
"Installation Specifi-
P3AM-7632-18ENZ0