Siemens 30 64 581 B5310 Maintenance Instruction page 24

Table of Contents

Advertisement

24
Final result/quality inspection and maintenance
5-
5
Final result/quality inspection and maintenance
SIE
IQ test
Perform the IQ test in accordance with the system or system configuration image quali-
ty test.
This test is part of system maintenance and should be performed at the end of system
maintenance. The image quality test does not need to be performed twice.
Monitor 44cm, 100/120HZ
SPR2-230.101.01.02.02
08.05
Page 24 of 26
CS PS 24
Siemens AG
Medical Solutions

Advertisement

Table of Contents
loading

Table of Contents