24
Final result/quality inspection and maintenance
5-
5
Final result/quality inspection and maintenance
SIE
IQ test
•
Perform the IQ test in accordance with the system or system configuration image quali-
ty test.
•
This test is part of system maintenance and should be performed at the end of system
maintenance. The image quality test does not need to be performed twice.
Monitor 44cm, 100/120HZ
SPR2-230.101.01.02.02
08.05
Page 24 of 26
CS PS 24
Siemens AG
Medical Solutions