Connecting Csu Cable - ABB Arc Guard System TVOC-2 Installation And Maintenance Manual

Hide thumbs Also See for Arc Guard System TVOC-2:
Table of Contents

Advertisement

Installation
Connecting CSU
cable
34
Follow this steps to connect CSU cable to the Arc Monitor:
Warning!
Make sure that supply voltage is switched off!
Follow this steps to connect CSU cable:
1
1. Remove the protection plug.
2. Connect current sensing cable to lower side right side of Arc Monitor by
pressing.
Current sensing units (CSU) inputs are X1: 21, 22.
Current sensing units (CSU) outputs are
Note!
Before the system is ready to use, a DIP switch configurations are needed.
For more information, see the chapter "Configurations" on page - 39.
2
X1:
23.

Advertisement

Table of Contents
loading

Table of Contents