Connecting
4.6 Wiring Sequence
Before the wiring of the Power Module can be performed, the following actions should be
taken:
1. The Power Module must be mounted correctly as previously describe in this manual.
2. The Power Module cover has been removed.
3. The Control Unit has been fitted correctly to the Power Module.
4. The Installer has reviewed the following instructions to ensure that all the necessary
5. The Installer must be fully conversant with all necessary local and national safety
Wiring sequence
To perform the correct wiring sequence, the following actions must be taken:
Step 1
Prepare the cables according to the dimensions
given in the previous section of this manual.
Step 2
1. Remove the retaining screws from the gland
2. Remove the gland plate.
Step 3
1. Fit the cable glands to the cables.
2. Ensure that the cable glands are unscrewed
An EMC cable gland is required to be fitted to the
motor power cable and the Control Unit cable to
ensure EMC compliance.
46
tools, to complete the wiring sequence, are available.
regulations regarding electrical installation of industrial products.
plate.
and the cables can move freely through the
cable glands.