Prepare The Foundation - Terra 60 - ABB 2 Series Operation And Installation Manual

Table of Contents

Advertisement

Installation
6.1.2

Prepare the foundation - Terra 60

6.1.2.1
Prepare the prefabricated foundation - Terra 60
Z1
Z1
6.1.2.2
Prepare a cast foundation - Terra 60
A
A
• Take the prefabricated foundation (A).
C
C
• Dig the pit (B) for the foundation (A).
B
• Place the foundation in the ground pit.
B
The front side is indicated by an arrow.
C
C
D
D
• Leave the foundation 15 mm above the ground level (D).
• Prepare the site and the conduits (C); route the power
and signal cables inside the foundation thought the
conduits applying cable slack of each cable 1000 mm.
• Pour concrete around the foundation to lock in place
the conduits and the foundation itself.
• Make the cast foundation according to the specifications
• Prepare the site and the conduits
• Route the power and signal cables highlighted in blue
thought the conduits applying each cable slack of 1000
mm.
• Create fixation holes for the EVSE base (in yellow).
NOTE
Contact the manufacturer to order the
foundation for your EVSE.
NOTE
Refer to
"11.3. Prefabricated foundation -
Terra 60"
for the foundation specifications.
NOTE
Refer to
"11.1. Footprint - Terra 60"
foundation specifications.
45
for the

Advertisement

Table of Contents
loading

This manual is also suitable for:

Terra 360 -ceTerra 60-ce

Table of Contents