Attachments
11.1
Footprint - Terra 60
The drawing (top view) shows all the necessary measurements to:
• drill the holes to fasten the EVSE to the floor/basement (in yellow)
• prepare the position of the cables in the ground (in blue)
85
151
65
54
62
62
177
506
603
FRONT SIDE
62
62
79