Footprint - Terra - ABB 2 Series Operation And Installation Manual

Table of Contents

Advertisement

Attachments
11.1

Footprint - Terra 60

The drawing (top view) shows all the necessary measurements to:
• drill the holes to fasten the EVSE to the floor/basement (in yellow)
• prepare the position of the cables in the ground (in blue)
85
151
65
54
62
62
177
506
603
FRONT SIDE
62
62
79

Advertisement

Table of Contents
loading

This manual is also suitable for:

Terra 360 -ceTerra 60-ce

Table of Contents