7.5
Seismic Anchorage
1. Prepare the wall anchorages. Key measurements off the final installation location.
(Figure 7.2)
2. Assemble the fastener group (3/8" x 1.0" Long Bolt, Lock Washer + Flat Washer).
(Figure 7.3)
3. Secure the Top Seismic Bracket to the top rear of the UPS using two (2) fastener
groups. Skip this step if the bracket is pre-installed. (Figure 7.4)
4. Secure the Top Seismic Bracket to the wall anchors prepared in Step 1. (Figure 7.4)
FIGURE 7.4: TOP SEISMIC BRACKET INSTALLATION
Value
S
(z/h=1)
DS
S
(z/h=0)
DS
I
P
Values apply to both standalone or a group of modules with or without being physically connected together.
1
20
3
4
4
Seismic Specifications
Floor & Wall Mounted
1.06g
1.70g
1.5
288V SCiB Energy Storage System Installation and Operation Manual – 203810-000
5 in (127 mm)
3
FIGURE 7.2: SEISMIC ANCHORAGE
FIGURE 7.3: FASTENER GROUP
(BOLT +LOCK WASHER + WASHER)
1
Floor Mount Only
0.53g
0.85g
1.5
5.95 in
(151 mm)
3/8" Bolt
Anchor (2)
- WALL PATTERN
a
b
c