Maintenance
Step 4:
Wastewater treatment
Acid-proof pump operation is stopped.
Wastewater is put to the tank for wastewater collection.
Water is put in the tank for cleaning and the tank is washed with pump.
Water used before is also put to the tank for wastewater collection.
While confi rming with pH test paper, neutralization agent is added gradually to
neutralise the tank.
Neutralised wastewater should be treated by industrial waste disposal contractor.
In case that wastewater is diluted by much abundant of water and drained to public
sewer, consult with a cleaning agent company in advance.
Step 5:
Neutrization treatment
Water is put in the tank for cleaning.
Acid-proof pump is operated while air is pulled out.
While confi rming with pH test paper, neutralization agent is added gradually so that pH
value be 7~9.
After pump is operated for prescribed time, neutrization treatment is fi nished.
After fi nishing neutrization treatment, neutrization liquid is drained to public sewer.
Circulation pump is operated and circulation system is washed suffi ciently until dirty
liquid is totally out.
Step 6:
Re-start operation
Water pipe is installed as before the cleaning.
After cleaning, water treatment is performed to prevent the corrosion occurred at
operation start.