Maintenance
Step 4:
Wastewater treatment
Acid-proof pump operation is stopped.
−
Wastewater is put to the tank for wastewater collection.
−
Water is put in the tank for cleaning and the tank is washed with pump.
−
Water used before is also put to the tank for wastewater collection.
−
While confi rming with pH test paper, neutralization agent is added gradually to
−
neutralise the tank.
Neutralised wastewater should be treated by industrial waste disposal contractor.
−
In case that wastewater is diluted by much abundant of water and drained to public
sewer, consult with a cleaning agent company in advance.
Step 5:
Neutrization treatment
Water is put in the tank for cleaning.
−
Acid-proof pump is operated while air is pulled out.
−
While confi rming with pH test paper, neutralization agent is added gradually so that pH
−
value be 7~9.
After pump is operated for prescribed time, neutrization treatment is fi nished.
−
After fi nishing neutrization treatment, neutrization liquid is drained to public sewer.
−
Circulation pump is operated and circulation system is washed suffi ciently until dirty
−
liquid is totally out.
Step 6:
Re-start operation
Water pipe is installed as before the cleaning.
−
After cleaning, water treatment is performed to prevent the corrosion occurred at
−
operation start.