NEC R120d-1E N8100-1955F User Manual page 132

Hide thumbs Also See for R120d-1E N8100-1955F:
Table of Contents

Advertisement

Chapter 2 Preparations
(1)
Installation the server
Mount the server to a rack in the following procedure.
1. Pull the slide rail from the outer rail that
is mounted on rack until the slide rail is
locked.
Note
Make sure that locking mechanism work normally.
2. With two or more persons, firmly hold the
server and mount it to the rack.
3. When the server is pushed into the rack
and it is locked, push the server to the
end while pulling the release levers
(blue) on both sides of the server.
4. Push the server until its lock on front
panel clicks.
132
Important
Always install the server with two or more persons.
Express5800/R120d-1E User's Guide
Locked state
2. Installation and Connection
Locking mechanism

Advertisement

Table of Contents
loading

Table of Contents