Download Print this page

Advertisement

Quick Links

Doc. N.°
1SEP619302P0001
Inline II
ZLBM / ZHBM123 Installation instruction
ZLBM / ZHBM123 Montageanleitung
ZLBM / ZHBM123 安装说明
- Rev. K
Warning
1 Pole
Insertion and removal of NH fuse-link.
Press in the release button and slide
the fuse gripping-lugs in or out.
Allowed fuse sizes in different InlineII devices
Device size
ZLBM / ZHBM1
ZLBM / ZHBM2
ZLBM / ZHBM3
*) =Only use together with 1SEP621288R0001 adapter
ZLBM / ZHBM
3 Pole
ZLBM/ZHBM123
Fuse size (IEC60269-2)
NH 1
NH 2
NH 3
x
x
x
x*
x

Advertisement

loading

Summary of Contents for ABB Inline II ZLBM123

  • Page 1 Doc. N.° 1SEP619302P0001 - Rev. K Inline II ZLBM / ZHBM123 Installation instruction ZLBM / ZHBM123 Montageanleitung ZLBM / ZHBM123 安装说明 Warning ZLBM / ZHBM 1 Pole 3 Pole ZLBM/ZHBM123 Insertion and removal of NH fuse-link. Press in the release button and slide the fuse gripping-lugs in or out.
  • Page 2 When mounting terminal kits, review dedicated installation instruction! Note! Pressure pad can be turned. Al-conductors have to be brushed and greased before connection. Al-Leiter müssen vor dem Anschluss gebürstet und gefettet werden. 铝导体在接线前必须去除氧化层并涂油。 Cu/AI Copyright 2023 ABB. All rights reserved. www.abb.com...

This manual is also suitable for:

Inline ii zhbm123