LUNA2000-2.0MWH Series Smart String ESS
User Manual
Figure 6-28 Wiring diagram
(1) Switch 5FCB2, connected to
the UPS output
----End
6.6 Installing Signal Cables
6.6.1 Installing FE Communications Cables
Step 1 Remove the protective cover.
Issue 15 (2023-11-01)
(2) Binding positions of live
wire 1775 and neutral wire
1777
Copyright © Huawei Technologies Co., Ltd.
6 Installing Cables
(3) Switch 5FCB, connected to
the UPS input
159