Toshiba A20-S259 - Satellite - Pentium 4 2.66 GHz Maintenance Manual page 429

Maintenance manual
Hide thumbs Also See for A20-S259 - Satellite - Pentium 4 2.66 GHz:
Table of Contents

Advertisement

4 Replacement Procedures
Removing the control PCB, top case and cover assembly
6. Remove the FPC cable (1) used for the control PCB connecting.
CAUTION: Pressure or stress should not be given on the FPC cable.
7. Remove the control PCB (2).
CAUTION: At first, move the control PCB to the left
8. Remove the top case (3)
CAUTION: Pressure or stress should not be given on the top case and gate TCP
9. Remove the screw and cover assembly (4).
CAUTION: Pressure or stress should not be given on the source TCP
Maximum value of torque with screw should be below 2.0kgf.cm
Figure 4-169 Removing the control PCB, top case and cover assembly
4-210
4.30 Fluorescent Lamp
Satellite A20 Maintenance Manual (960-444)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Satellite a20 series

Table of Contents