Chapter 2

Site Preparation

You may want to copy and use the site preparation checklist.

Site Preparation Checklist

Table 2-1. Site Preparation Checklist
HP NetServer Customer Responsibilities
Logical and physical network design provided
Server configuration parameters determined
Disk partition and directory structure determined
Required incoming power and data cabling in place
Working LAN, one working client, one working printer available, (if integrating into an
existing network)
Software license requirements met
Networking peripherals connected
12
Connecting and Routing Cables to the HP NetServer LPr
Figure 2-1. The HP NetServer LPr