HP D5970A - NetServer - LCII Manual page 9

Rack cabling reference
Hide thumbs Also See for D5970A - NetServer - LCII:
Table of Contents

Advertisement

Chapter 1
Unpack Remaining Components
Unpack each component in the order in which you assemble them (from the
bottom of the rack upward). Each package contains rack installation instructions
or a user guide.
NOTE
If an Uninterruptible Power Supply (UPS) is included, plug it
in as soon as you unbox it. Doing so helps ensure batteries are
charged when rack installation is completed.
5.
Build Basic Rack Assembly
Position, Tie Together, and Open Up the Rack
1. Determine how rack bays are to be positioned. If two or more racks are to
be tied together, use the optional tie-together kit. Otherwise skip this step.
Newer models may be attached, or tied together, before or after equipment
is mounted in them. Follow instructions included with tie together
hardware.
NOTE
HP Rack System product numbers J1487B, J1487B option
AXH, and J1488A require that enclosures be attached, or tied
together, before any components are placed in them. To avoid
problems, if racks are to be tied together, do so before
installing units, rails, shelves, or other hardware. Otherwise,
you may have to remove components from the rack to gain
access to the tie-bolt locations.
2. If present, remove the front and rear doors to increase accessibility inside
the rack. Follow instructions shipped with the rack to do so.
About This Cabling Reference
5

Advertisement

Table of Contents
loading

Table of Contents