HP D5970A - NetServer - LCII Manual page 7

Rack cabling reference
Hide thumbs Also See for D5970A - NetServer - LCII:
Table of Contents

Advertisement

Chapter 1
3.
Verify Shipment and Unpack Server and Storage Unit
WARNING
The LPr weighs about 40 pounds (18 kg.). Take appropriate
lifting precautions when moving it. Get help when removing
or replacing an LPr towards the top of a 2 meter rack.
Compare the order documents to the packing list or to a list of boxes received.
Check to see that all parts are present. Unpack the HP NetServer LPr and
external storage and tape backup units (if any were ordered).
NOTE
Save the boxes and packaging materials if you intend to reship
the units and rack.
4.
Prepare Rack Enclosures for Assembly
WARNING
A tip-over hazard exists. Rack enclosures are shipped upright
and are top-heavy. Never move enclosures without adequate
equipment and assistance. Use caution to prevent the rack
from falling over and causing potential damage or injury.
Use the anti-tip foot in the rack base.
If you receive pre-configured units, follow assembly instructions from your
organization first, if you have them. Otherwise, continue with this set of
instructions.
Move Rack Enclosures and Other Units to Installation Location
WARNING
Whenever you lift equipment, limit the amount of weight
each person picks up. Lift with your legs, not with your back.
Use two or more people and the proper equipment to move the rack enclosure,
server, mass storage units, and other components. Stage cartons a few feet from
your assembly and final power-up location.
About This Cabling Reference
3

Advertisement

Table of Contents
loading

Table of Contents