Preparations For Installation Work; Scope Of Installation Work; Unpacking And Device Check; Installation Conditions - Fujitsu IP-900E Hardware User's Manual

Hide thumbs Also See for IP-900E:
Table of Contents

Advertisement

Appendix
A.3
A.3
This section contains notes and describes check items for installation work.
A.3.1 Scope of installation work
For details about the scope of installation work, see Section 4.1, "Installation Preparations."
A.3.2 Unpacking and device check
Unpack and check the device as follows:
• During unpacking, carefully handle the device so as not to apply shock to it or damage its
appearance.
• Make sure that the device and accompanying package are not damaged.
• Make sure that wiring does not have a short circuit and is not disconnected.
• Make sure that no incorrect screw is contained in the package.
A.3.3 Installation conditions
For the classification of this work, see Section 2.1, "Installation Conditions."
The installation method may differ depending on the site where the device is installed. In
principle, the installation method conforms to the appropriate method for the site.
Do not install the device at the following locations:
• Place exposed to direct sunlight or near a heater.
• Humid or dusty place
• Place where the device is exposed to shock or vibration
• Unstable place, such as on a slope or place with a lot of weight on it
• Place where the device is subject to strong magnetic and radio waves
A.3.4 Connecting external cables
Refer to Chapter 2, "Installation and Connection," for the connection methods, Section 4.2,
"Cables and Connector Details," and A.2.3, "Function specifications," for device connector pin
assignments.
IP-900E/IP-900D series

Preparations for Installation Work

76