Its Network Switch Test And Inspection Procedures - Philips IntelliVue Telemetry System Infrastructure Installation And Service Manual

Intellivue telemetry system infrastructure
Table of Contents

Advertisement

ITS Network Switch Test and Inspection Procedures

Table 5-9 lists which tests you must perform when performing service events on
IntelliVue Telemetry System network switches.
Installation
Preventive Maintenance
Any component repair or replacement
Hardware Upgrade
Software Upgrade
All other Service Events
Test Block
Name
Network Switch
Visual
Network Switch
Power On
Network Switch
Performance
Network Switch
Revision Check
Network Switch
Safety
IntelliVue Telemetry System Infrastructure Installation and Service Guide
Table 5-11: ITS UPS Test and Inspection Requirements
When Performing this
Service Event...
Table 5-12: ITS UPS Test and Inspection Matrix
Test or Inspection to Perform
Inspect all system components for
obvious damage. Visually inspect all
system components, cables, and
connectors. Check for signs of abrasion,
wear, or other damage.
With power connected to each active
Network device, observe that all lights
visible on the front panel are in proper
status and that no error conditions are
shown.
HP 2524: After self test, verify the Power
LED and Fan LED are solid green and
that the LINK LED for each port with a
cable connected is green.
Check port speed and duplex LEDs.
No performance check is required.
No revision check is required.
No safety test is required
ITS Network Switch Test and Inspection Procedures
Complete These Required Test(s)
Visual, Power On
N/A
Power On
N/A
N/A
Visual, Power On
Expected Results
No visible damage
Devices power up
into expected
status; no error
indications are
shown.
Information to
Record on
Service Record
V:P or V:F
where:
P = Pass
F = Fail
PO:P or PO:F
where:
P = Pass
F = Fail
P:NA
where:
NA=Not
Applicable
RC:NA
where:
NA=Not
Applicable
S:NA
where:
NA=Not
Applicable
5-7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents