Download Print this page

Operational Items In Overhauling - Toshiba e-studio166 Service Handbook

Multifunctional digital systems
Hide thumbs Also See for e-studio166:

Advertisement

4.2

Operational Items in Overhauling

Overhaul each equipment with the following timing.
e-STUDIO163/166:
e-STUDIO203/206:
(1)
Replace all the supplies.
(2)
Check the components in the drive section (gears, pulleys, timing belts, etc.). Replace them with
new ones if they are damaged.
(3)
Check all the adhesives such as tape and Mylar if they are damaged or have become unstuck.
Replace them with new ones if necessary.
(4)
Check the performance of all the switches and sensors. Replace them with new ones if neces-
sary.
(5)
Clean inside the equipment thoroughly.
(6)
Check if the harnesses, thermistors, fuses, etc. are damaged. Replace them if necessary.
e-STUDIO163/166/203/206
PREVENTIVE MAINTENANCE (PM)
When the number of output pages has reached 216,000 or 2.5 years have
passed from the start of use (Whichever is earlier)
When the number of output pages has reached 270,000 or 2.5 years have
passed from the start of use (Whichever is earlier)
4 - 2
07/02
© 2005 - 2009 TOSHIBA TEC CORPORATION All rights reserved

Hide quick links:

Advertisement

loading

This manual is also suitable for:

E-studio163E-studio203E-studio206