Panasonic KX-NCP0158 Quick Installation Manual page 31

Dect 8-channel ip cell station unit
Hide thumbs Also See for KX-NCP0158:
Table of Contents

Advertisement

4 Before Site Survey
[Connecting the PoE Hub or PoE Adaptor]
To PoE Hub/PoE Adaptor
Ethernet Straight Cable
4.
Install the CS temporarily for the site survey. Install the CS at least 2 m above the floor, and place the
antennas so that they are pointing in directions that are 90 degrees apart (for antenna diversity), as follows:
45º
90º
45º
At least 2 m
Quick Installation Guide
31

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kx-ncp0158ce

Table of Contents