Confirming The Status Of Air Synchronisation For Ip Cell Stations - Panasonic KX-NCP0158 Quick Installation Manual

Dect 8-channel ip cell station unit
Hide thumbs Also See for KX-NCP0158:
Table of Contents

Advertisement

9 Confirming the Status of Air Synchronisation for IP Cell Stations

9 Confirming the Status of Air Synchronisation
for IP Cell Stations
After registering the IP-CS to the PBX, it is necessary to monitor the status of air synchronisation for the IP-CS.
If the monitoring results are not satisfactory, relocate the IP-CS or change the IP-CS that it is currently
synchronised with to another CS using the Maintenance Console.
Monitoring Air Synchronisation
The status of air synchronisation for IP-CSs can be displayed and collected by the following procedure:
1.
From the Utility menu, select CS Status Monitor.
2.
From the Interval Timer drop-down list, select the desired interval time for monitoring.
3.
Click Start to monitor the status of air synchronisation.
Note
For details about other parameters on this screen, refer to the PC Programming Manual for your PBX.
4.
Confirm the value in the Monitored Level column.
The monitored level is indicated as follows:
Monitored Level
12 or higher
08 to 11
06 to 07
05
03 to 04
50
Quick Installation Guide
May be reset due to synchronisation failure of CSs.
Relocate the IP-CS.
Good
Better
Good
Air synchronisation is established.
it is necessary to monitor the status of synchronisation using the
Maintenance Console. This is necessary because IP-CSs may be
reset due to synchronisation failure if the radio signal strength
fluctuates depending on changes in the installation environment such
as opening/closing doors.
Description

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kx-ncp0158ce

Table of Contents