Installing The Operator Panel - Siemens G120P Technical Manual

Variable speed drive
Table of Contents

Advertisement

Installing
5

Installing the operator panel

5.5 Installing the operator panel
44 | 98
Siemens
Building Technologies
6. Connect up all of the required terminals on the terminal strip in this way.
7. Route the signal cables in such a way that you can completely close the front
doors after wiring the terminal strip.
8. If you use shielded cables, then you must connect the shield to the mounting
plate of the control cabinet or to the shield support of the variable speed drive
through a good electrical connection and a large surface area. See also: EMC
design guidelines
(http://support.automation.siemens.com/WW/view/en/60612658)
9. Use strain relief.
To connect up the operator panel to the Control Unit, proceed as follows:
Figure 20: Operator panel
1. Fit the operator panel on the Control Unit as illustrated in the diagram.
2. Press the operator panel against the Control Unit until it audibly engages.
A5E36496664A_d
2016-03-17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents