Setting and Installing a CS Temporarily for Site Survey
Perform the procedure in "Setting and Installing a CS Temporarily" to position the CS at the temporary position.
1.
Install the CS temporarily for the site survey, as follows. Install the CS at least 2 m (6 ft 7 in) above the
floor, and place the antennas so that they are pointing in directions that are 90 degrees apart (for antenna
diversity).
45º
*1
*1
At least 2 m (6 ft 7 in)
44
Installation Guide
90º
45º