Level 1 and 2 Service Manual
Slider Test Procedures
6809513A80-B
5.
Close the fixture for 15 seconds.
Figure 78. El Mylar Press Fixture Closed
6.
Open the fixture and check the assembly for correct positioning of the mylar
on the PCB.
Perform the following slider test procedures after phone assembly has been
completed.
February 19, 2008
Disassembly
v513346
67