The following checklist must be carefully observed. Read the safety information in
the Equipment Manuals before starting work.
Table 2-2
The ambient conditions must be permissible. See Equipment Manuals.
The components must be firmly attached to the fixing points provided.
The cooling air can flow unobstructed.
The ventilation clearances for the components must be observed.
The CompactFlash Card must be inserted in the Control Unit.
All necessary components of the configured drive line-up are installed and
available.
The DRIVE-CLiQ topology rules must be observed.
For information about rules for wiring with DRIVE-CLiQ, see Section 2.3.
The line-side and motor-side power cables must be dimensioned and routed
in accordance with the ambient and routing conditions. The maximum
permissible cable lengths between the converter and the motor must be
observed depending on the type of cables used.
The cables must be properly connected with the correct torque to the
component terminals. The cables for the motor and low-voltage switchgear
must also be connected with the required torques.
Has all wiring work been successfully completed?
Are all connectors correctly plugged in and screwed in place?
Have all the screws been tightened to the specified torque?
Have all the covers for the DC link been closed and latched into place?
Are the shield connections installed correctly?
2-30
Checklist for commissioning (booksize)
Check
SINAMICS S120 Installation and Start-Up Manual, 12/04 Edition
E Siemens AG, 2004. All rights reserved
O. K.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents