Installation Procedure - Mitsubishi Electric GOT1000 General Description Manual

Graphic operation
Hide thumbs Also See for GOT1000:
Table of Contents

Advertisement

5.5 Installation Procedure

The GOT mounting procedure is as follows.
For the panel cutting dimensions of each GOT, refer to the following.
5.2 Panel Cutting Dimensions
(1) Insert the GOT into the panel opening from the front side.
GOT
(2) Place the mounting fixtures (included with GOT) on the mounting
fixture attaching part of the GOT, and fix them by tightening the
mounting screws in the torque range of 0.36 to 0.48N·m.
(Failure to do so may distort the panel and make a surface waviness
on the protective sheet.)
• For GT1595-X: Fix the GOT with 8
mounting fixtures.
(3) A protection film is attached on the display section of GOT prior to
shipment.
Remove the film when the installation is compelted.
Magnified figure
39
Mounting hole
• For other than GT1595-X: Fix the
GOT with 4 mounting fixtures.
Magnified figure

Advertisement

Table of Contents
loading

Table of Contents