6.1 Connecting the AC Power Supply

Procedure
Step 1 Check whether the voltage across the input ports of AC input circuit breakers for the
upper-level device is the same as the local voltage. If no, ask professionals to rectify the fault.
Step 2 Switch off the AC input circuit breakers for the upper-level device.
Step 3 Observe the Run indicator (green) on the rectifier panel. If it is steady on, the rectifier is
powered on successfully.
Step 4 Observe the Run indicator (green) and LCD on the SMU panel. If the indicator is blinking and
the LCD is on, the SMU is powered on successfully.
----End

6.2 Setting the Display Language

After powering on the SMU, select English by pressing
press

6.3 Setting Time and Date

6.3.1 SMU01A

Set the time and date for the SMU01A as required.
Issue 06 (2014-02-20)
to enter the standby screen.
If you select an undesired language, remove and then insert the SMU. Select a language again after the
SMU restarts.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6

Commissioning

or
6 Commissioning
on the LCD, and then