Removal Of Ballasts 3 And 4 (B/Q-Module) - Panasonic PT-DZ12000U Service Manual

Dlp based projector
Hide thumbs Also See for PT-DZ12000U:
Table of Contents

Advertisement

PT-DZ12000U / PT-DZ12000E / PT-D12000U / PT-D12000E / PT-DW100U / PT-DW100E
(10) Unscrew each of 4 screws and remove the ballasts 1 and 2 (B/Q-
Module).

12.18. Removal of Ballasts 3 and 4 (B/Q-Module)

(1)
Remove the upper case according to the section 12.2. "Removal
of Upper Case".
(2)
Loosen each of 3 screws until they idle, remove the lamp units 3
and 4.
(3)
Unscrew each of 1 screw and release 2 lamp unit terminals of the
ballast block R.
42

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pt-d12000uPt-dw100ePt-dz12000ePt-d12000ePt-dw100u

Table of Contents