Dell S5000 Deployment/Configuration Manual page 28

Deployment of a converged infrastructure with fcoe
Hide thumbs Also See for S5000:
Table of Contents

Advertisement

Dell Networking S5000: Deployment of a Converged Infrastructure with FCoE
Center System Manager GUI. On the left-hand side we navigate to 'Storage Center->Servers-
>Finance_Server', and then we click the 'Add HBAs to Server' button. In Figure 26 below you can see
we have added the ports corresponding to the new Dell QLogic QLE8262 CNA adapter to the 'server
object'.
Figure 26: Modifying the 'server object' on Dell Compellent to include the Dell QLogic QLE8262 CNA ports
Additionally, we need to update the FC zoning configurations on each FC switch by removing the FC
HBA WWPN and adding the Dell QLogic CNA WWPN. Notice how we do not need to add the Dell
S5000 WWPN to the zoning configuration.
Figure 27: Zoning for fabric A FC switch
> zonecreate
financeServer1_p1_test,"50:00:d3:10:00:ed:b2:3d;50:00:d3:10:00:ed:b2:43;50:00:d3:10:00:ed:b2:3b;
50:00:d3:10:00:ed:b2:41;20:01:00:0e:1e:0f:2d:8e"
> cfgcreate zoneCfg_test,"financeServer1_p1_test"
> cfgenable zoneCfg_test
> cfgsave
28
Deployment of a Converged Infrastructure with FCoE
Deployment/Configuration Guide

Advertisement

Table of Contents
loading

Table of Contents