Mitsubishi Electric MELSEC-Q Series Programming Manual page 151

Melsap-l
Hide thumbs Also See for MELSEC-Q Series:
Table of Contents

Advertisement

Processing time required to switch SFC program from WAIT status to scan status
The processing time required to switch an SFC program from a WAIT status to a scan status is shown below. Although the
scanning time is extended by the amount of the processing time, this will not result in a watchdog timer error detection. No
system processing time is required when switching from a scan status to a WAIT status.
Switching time = (number of created blocks  Km) + (number of created steps  Kn) + (SFC program capacity  Kp) + Kq
Constant
High Performance
Model QCPU
Q02CPU
QnHCPU
Km
451.9s
194.7s
Kn
19.1s
8.2s
Kp
6.2s
2.7s
Kq
Constant Universal model QCPU
Q03UDVCPU
Q04UDVCPU, Q06UDVCPU, Q13UDVCPU,
Q26UDVCPU
Km
9.6s
6.3s
Kn
0.6s
1.0s
Kp
0.7s
0.6s
Kq
8920s
5400s
5.2 Whole Program Processing of High Performance Model QCPU, Process CPU, Redundant CPU, Universal Model QCPU, and
Process
Universal model QCPU
CPU
QnPHCPU
Q00UJCPU,
Q02UCPU
Q00UCPU,
Q01UCPU
194.7s
11.8s
11.2s
8.2s
3.8s
3.6s
2.7s
0.9s
0.8s
8893.5s
8470s
Q03UDCPU,
Q04UDHCPU,
Q03UDECPU
Q06UDHCPU,
Q04UDEHCPU,
Q06UDEHCPU
10.6s
4.4s
0.7s
0.5s
0.8s
0.7s
13970s
8070s
LCPU
L02SCPU,
L02CPU,
L06CPU,
L02SCPU-P
L02CPU-P
L06CPU-P
11.8s
11.6s
4.4s
3.8s
2.8s
0.5s
0.9s
0.8s
0.7s
8893.5s
8460.0s
8070.0s
5 SFC PROGRAM PROCESSING SEQUENCE
Q10UDHCPU,
Q13UDHCPU,
Q20UDHCPU,
Q26UDHCPU,
Q10UDEHCPU,
Q13UDEHCPU,
Q20UDEHCPU,
Q26UDEHCPU,
5
Q50UDEHCPU,
Q100UDEHCPU
7.3s
1.1s
0.7s
8100s
L26CPU,
L26CPU-P,
L26CPU-BT,
L26CPU-PBT
7.3s
1.1s
0.7s
8100.0s
149

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec-l series

Table of Contents