ABB 2CSYK1102C/S Product Manual page 31

Switch actuator with rocker switches
Table of Contents

Advertisement

MYLOS
Building Automation
Commissioning
®
Long pressure: Base
Long pressure: Multiplier [0...255] (if "In case of long pressure" or if "in case of long pressure (if object
value = 1)")
These two parameters allow you to determine the time that is sufficient to consider a pressure as a long pressure.
Time interval is calculated as follows: Period for long pressure = Base * Multiplier.
MYLOS
Building Automation | Commissioning 31
®

Advertisement

Table of Contents
loading

This manual is also suitable for:

2csyk1106c/s2csyk1103c/s

Table of Contents