Start Automatic Operation - Mitsubishi Electric CR750-D Instruction Manual

Industrial robot
Hide thumbs Also See for CR750-D:
Table of Contents

Advertisement

4Basic operations

(7) Start automatic operation.

CAUTION
In the following explanation, automatic operation will be carried out with the controller.
Starting the automatic operation by T/B is available in the version of T/B 1.7 or later. Refer to separate "Instruc -
tion Manual/Detailed Explanation of Functions and Operations" for details.
Prepare the controller
Dsiable the T/B
MANUAL
Enable the R/C
Set override
override
Dsiplay
DOWN
Set override
CAUTION
4-102 Programming
Before starting automatic operation, always confirm the following item. Starting
automatic operation without confirming these items could lead to property damage or
physical injury.
・ Make sure that there are no operators near the robot.
・ Make sure that the safety fence is locked, and operators cannot enter
unintentionally.
・ Make sure that there are no unnecessary items, such as tools, inside the robot
operation range.
・ Make sure that the workpiece is correctly placed at the designated position.
・ Confirm that the program operates correctly with step operation.
Up :DISABLE
Down:ENABLE
*Lighting
Rear of T/B
MODE
AUTOMATIC
* Following figures are CR750 controller's switch and display panel.
CHNG DISP
UP
The servo will turn OFF when the controller mode is changed.
Note that axes not provided with brakes could drop with their own weight.
1) Set the T/B [ENABLE] switch to
"DISABLE".
2) Set the controller mode to "AUTOMATIC".
3) Press the controller [CHNG DISP] switch
twice, and display the "OVERRIDE" on the
STATUS NUMBER display panel. (A "o" will
appear at the lower left.)
Press the [DOWN] key several times, and
display "10".
The operation speed will be set to 10%.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cr751-qCr760-dCr750-qCr751-d

Table of Contents