COM600 series 5.1
Sequence Control Configuration Manual
3. Add additional STEPGGIO logical nodes depending on the number of steps intended
for the sequence being configured.
4. Repeat the steps 1 - 4 to add all the needed logical nodes (SEQGGIO1/ STEPGGIO*)
and associated data objects as defined in Table 3.4-1.
An example of a finished configuration for a four step sequence after all the logical nodes
and associated data objects have been defined is shown in Figure 3.4-2
Figure 3.4-2 Communication structure view for a four step sequence
1MRS755001
SAB600_SC_Four_Step_Sequence_Example.png