ABB COM600 series User Configuration Manual page 25

Substation management units 5.1 sequence control
Hide thumbs Also See for COM600 series:
Table of Contents

Advertisement

1MRS755001
COM600 series 5.1
Sequence Control Configuration Manual
Figure 4.5-1 Adding sequence start action to a sequence PRG
3. Click Add.
4. Select the added Start action from the Devices view. In the corresponding program
editor, define the sequence start action, see Figure 4.5-2.
Figure 4.5-2 Sequence start action definition
5. Right-click the added POU object in the Devices view and add a new action by
selecting Add Object > Action.
6. Name the new action as End. Set Structured Text (ST) as the implementation
language, see Figure 4.5-3.
Logic_Editor_Add_Start_Action.png
sequence_start.png
25