Setting the project path as output path
If you want to use the project directory as output path for the DO list:
1. Activate the "Using project directory as output directory" checkbox.
After activation, an additional placeholder is set in front of the path of the DO list.
Figure 5-4
2. Enter the path to the DO list manually starting from the project directory.
Setting an absolute path
If you want to set an absolute path for the DO list, proceed as follows:
1. Set an absolute path at "DO list" in the "Settings..." dialog if the "Using project directory as
output directory" checkbox is deactivated.
2. Select the path and the required Drive object list via the
5.2.3
Defining unknown devices
Unknown devices are devices from third-parties or SIEMENS devices that are not defined in
the catalog.
These devices are defined at "Device settings" in the "Settings..." dialog so that they can be
detected and derived from the EPLAN Add-In.
Figure 5-5
"Settings..." dialog
SINUMERIK Integrate Create MyConfig - EPLAN Electric P8 Add-In
Operating Manual, 12/2017, A5E43099659B-AA
DO list: Project directory as output path
Configuring with EPLAN Add-In
5.2 Settings
button.
19