Chapter 2 Preparations
8.
Attach Top Cover.
See Chapter 2 (1.5 Top Cover).
9.
Mount the server onto the rack.
See Chapter 2 (2.1 Installation).
10.
Install disk drives.
See Chapter 2 (1.21 Drives).
11.
Install power supply units
See Chapter 2 (1.22 Power Supply Unit).
12.
Attach Front Bezel.
See Chapter 2 (1.4 Front Bezel).
Installation and removal for internal optional devices are now complete.
Continue the setup with reference to Chapter 2 (2.2 Connection).
48
Note
Do not let the server operate for long time with the top cover, air baffle, expansion
slot cover, or the blank cover removed. If the server operates under these
conditions, it will not be properly ventilated and the cooling mechanism will not
properly function, which may lead to damages due to high temperature.
Express5800/R120h-1E User's Guide
1. Installing Internal Optional Devices