Removing Riser Card - NEC Express5800 Series User Manual

Hide thumbs Also See for Express5800 Series:
Table of Contents

Advertisement

Chapter 2 Preparations
1.9.2

Removing Riser Card

Please prepare the following before installing the options.
Parts included in the option kit.
T-10 hexalobular driver
To install the components, follow these steps.
1.
Backup all of the data for server.
2.
See steps 1 to 6 in Chapter 2 (1.2 Overview of Installation and Removal) for preparations.
3.
Hold the both ends of the PCI riser card unit and lift it off.
・1st Riser card
In order to prevent the damage to server's main body or the expansion board,
Note
please remove all the AC power cables before removing/installing riser card.
Important
Do not touch the terminal part of PCI riser card or PCI card and the signal
pins of electric parts installed on the board. Installing boards with dirt or oil
can cause malfunction.
Express5800/R120h-1E User's Guide
1. Installing Internal Optional Devices
81

Advertisement

Table of Contents
loading

This manual is also suitable for:

Express5800/r120h-1e

Table of Contents