Using Dell Readyrails (Optional) - Dell Networking C9010 Getting Started Manual

Hide thumbs Also See for Networking C9010:
Table of Contents

Advertisement

Figure 8. Chassis Installed in a 4-Post Rack

Using Dell ReadyRails (Optional)

Dell Networking offers the Dell ReadyRails rack mounting system as an option to ease the installation of a
switch in a 2-post or 4-post rack. You must purchase a ReadyRails kit as a separate item; it is not shipped
with the C9010 switch.
You can install Read Rails using a tool-less method in a non-threaded-hole rack or a tooled method in a
threaded-hole rack. Dell ReadyRails support a rack length of 24 to 30 inches. The ReadyRails kit consists
of:
Chassis rails for the left and right sides of the C9010 chassis (items 1 and 2 in Figure 9)
Left and right rail brackets that fit into the front rails on 2-post racks (items 3 and 4 in Figure 9)
Front rails for the left and right posts of 2- and 4-post racks (items 5 and 6 in Figure 9)
Rear rails that fit into the left and right front rails on 4-post racks (items 7 and 8 in Figure 9)
14
Installing the Hardware

Advertisement

Table of Contents
loading

Table of Contents