GE H
EALTHCARE
D
5213326-100, R
IRECTION
Chapter 3Installation
Section 3-1Overview
3-1-1
Purpose
This chapter contains information needed to install the unit. Included are references to a procedure that
describes how to receive and unpack the equipment and how to file a damage or loss claim
3-1-2
Table Of Contents
Table 3-1
S.No
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
Approv e d Docu m ent - 5213326-100TPH_r3.pdf Page 58 of 252
3
EVISION
Contents in Chapter 3
Description
Overview
Receiving and Unpacking LOGIQ A3
Safety Reminders
Moving into Position
Adjusting System Clock
Product Locator Installation Card
Preparing for Installation
Completing the Installation
System Configuration
Network Connectivity
Optional Peripherals
Connectivity Installation Worksheet
Paper work
Page Number
3-1
3-3
3-9
3-10
3-10
3-10
3-11
3-12
3-18
3-19
3-23
3-29
3-37
Chapter 3
LOGIQ™ A3 S
M
ERVICE
ANUAL
3-1