Power Off/ Shutdown; System Power Down - GE LOGIQ A3 Basic Service Manual

Table of Contents

Advertisement

GE H
EALTHCARE
D
5213326-100, R
IRECTION
3-4-5

Power Off/ Shutdown

NOTE:
After turning off a system, wait at least ten seconds before turning it on again. The system may
not be able to boot if power is recycled too quickly.
3-4-5-1

System Power Down

To power off the system:
1.) Lightly press the Power On/Off switch at the front of the system once. The Shutdown window
is displayed.
NOTE:
DO NOT press and hold down the Power On/Off switch to shutdown the system. Instead, lightly
press the Power On/Off switch and select Shutdown.
2.) Using the Trackball, select Shutdown.
3.) Disconnect the probes.
4.) If daily maintenance is to be performed, turn off the circuit breaker.
NOTE:
Do not pull the power cable without turning off the circuit breaker.
CAUTION
(or)
1.) Press the Power On/Off switch on the Control Panel , and hold it till power goes off from the
system.
3-16
Approv e d Docu m ent - 5213326-100TPH_r3.pdf Page 73 of 252
3
EVISION
The shutdown process takes a few seconds and is completed when the control panel
illumination shuts down.
Clean or disinfect all probes as necessary. Store them in their shipping cases to avoid
damage.
DO NOT turn off the circuit breaker before the Power On/Off switch LED is
amber.
Data may be lost or system software damaged if the circuit breaker is turned off
before the Power On LED is amber.
Section 3-4 - Completing the Installation
LOGIQ™ A3 S
M
ERVICE
ANUAL

Advertisement

Table of Contents
loading

Table of Contents