Operation And Maintenance; O&M Precautions; Routine Maintenance - Huawei PDU8000 User Manual

Ups power distribution cabinet
Hide thumbs Also See for PDU8000:
Table of Contents

Advertisement

PDU8000 UPS Power Distribution Cabinet
User Manual
8.1 O&M Precautions
O&M Personnel Skill Requirements
O&M personnel must be qualified power distribution system engineers who are familiar with
the data center power supply and distribution system configurations and the operations for
each core component.
Technical Documents
Table 8-1
Table 8-1 Technical documents
Technical Document
Layout
Schematic diagram
DC-DC Converting Principle
Diagram

8.2 Routine Maintenance

Routine maintenance is performed on a regular basis when the equipment is running properly
to find out and eliminate defects or potential risks in a timely manner.
Issue 01 (2016-03-04)
8

Operation and Maintenance

lists the technical documents required for PDC installation.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Function
Describes the appearance
and circuit breaker
locations of the PDC.
Describes the control
relationship of the power
distribution system.
Describes the connection
positions of input power
cables, output power
cables, and monitoring
cables for the PDC.
8 Operation and Maintenance
Obtaining Method
(Remarks)
Delivered with the
PDU8000
Delivered with the
PDU8000
Delivered with the
PDU8000
54

Advertisement

Table of Contents
loading

Table of Contents