PDU8000 Precision PDC-T
User Manual
2.1 Site Requirements
The PDC site requirements are as follows:
2.2 Installation Preparations
Before installation, unpack and check the product, make available all required technical
documents, tools, and materials, check the installation environment, and train onsite
installation personnel.
2.2.1 Obtaining Tools and Materials
The construction team needs to prepare the tools, meters, and basic materials required for
hardware installation.
Issue 01 (2017-07-15)
Far away from dust, smoke, harmful gas, and corrosive, flammable, or explosive objects.
Free of interference from strong electromagnetic fields.
Cabling space should be planned for the site, and cable ladders and cable trays should be
designed for the PDC installation position.
The error of the installation platform levelness must be less than 10 mm.
Meets the PDC input rating requirements (see the Schematic Diagram delivered with the
product for details).
Temperature: -5° C to +40° C
Relative humidity: 5%-95% RH
Altitude: < 2000 m (derated when the altitude exceeds 2000 m). For the derating details,
contact Huawei technical support.
Huawei will not be liable for any consequences caused if the installation environment does not meet the
requirements.