Huawei PDU8000-0630ACV4-SCA108 User Manual page 26

Precision pdc-t
Table of Contents

Advertisement

PDU8000 Precision PDC-T
User Manual
2.
3.
Step 3 Switch on the SPD circuit breaker.
If the indicator of an SPD module is green, the SPD module is running properly. If an
indicator is red, the corresponding SPD module has failed and must be promptly replaced.
Step 4 Switch on the input power circuit breaker to power on the PDC. If the power indicator on the
front panel of the PDC lights up, the PDC is powered on properly.
The input power circuit breaker refers to the output circuit breaker that controls power supply from the
upstream power distribution equipment to the PDC.
Step 5 After the MDU screen starts, log in to the system as the admin user (the preset password is
000001), and perform operations.
Issue 01 (2017-07-15)
Check that the insulation resistance between the live wires, between the live wire and the
PE, and between the live line and the neutral wire is no less than 0.5 megohm using a
multimeter.
After checking, turn off all the circuit breakers.
If this is the initial startup, set the language, time, date, network parameters, and system
parameters by using the Setting Wizard.
If this is not the initial startup and these parameters have been set before, the system uses
the existing settings by default.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Power-On Commissioning
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pdu8000 series

Table of Contents