Check Before Power-On Commissioning - Huawei PDU8000-0630ACV4-SCA108 User Manual

Precision pdc-t
Table of Contents

Advertisement

PDU8000 Precision PDC-T
User Manual
3

Check Before Power-on Commissioning

Table 3-1 Hardware installation checklist
No.
1
2
3
4
5
Table 3-2 Electrical connection checklist
No.
1
2
3
4
5
Table 3-3 Cable installation checklist
No.
1
Issue 01 (2017-07-15)
Check Item
The cabinet is clean, without redundant screws, copper
wires, or other debris.
The paint on the cabinet exterior is intact.
The cabinet door and lock work properly.
All labels are correct, clear, and complete.
The surrounding area of the cabinet contains no waste tape,
cable ties, paper, or packing materials.
Check Item
All cables are connected properly.
The ground cable is connected properly.
The excessive sections of ground cables and power cables
are cut off.
Phase cables are connected properly.
All circuit breakers are OFF.
Check Item
All bolts are tightened, especially the bolts used for
electrical connection. Flat washers and spring washers are
installed properly.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Check Before Power-on Commissioning
Result
□Yes □No
□Yes □No
□Yes □No
□Yes □No
□Yes □No
Result
□Yes □No
□Yes □No
□Yes □No
□Yes □No
□Yes □No
Result
□Yes □No
16

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pdu8000 series

Table of Contents